Our Project
The corrosion resistance, hardness, wear resistance, insulation and heat resistance of aluminum products have been grealty improved after surface anodization. The outer layer of the anodic oxide film of aluminum is porous and easy to adsorb dye and coloured material, so it can be dyed to improve its decoration. After sandblasting treatment, can effectively remove the machining marks and scratches Aluminum Alloy surface, can make the Aluminum Alloy surface is uniform and bright or matte uniform shape,beautiful and elegant.
![Shanghai, China](/uploads/image/20190313/20190313083359595959.jpg)
Project Location: Shanghai, China
Capacity: 60MWp
Completion Year: 2018
Type: Ground Mounted
![Klang, Malaysia](/uploads/image/20190313/20190313083234183418.jpg)
Project Location: Klang, Malaysia
Capacity: 426kWp
Completion Year: 2016
Type: Metal roof Mounted
![Tuas, Singapore](/uploads/image/20190313/20190313083238633863.jpg)
Project Location: Tuas, Singapore
Capacity: 1MWp
Completion Year: 2017
Type: Metal roof Mounted
![Singapore](/uploads/image/20190313/20190313083268036803.jpg)
Project Location: Singapore
Capacity: 221Wp
Completion Year: 2017
Type: Metal roof Mounted
![Iloilo, Philippines](/uploads/image/20190313/20190313083132653265.jpg)
Project Location: Iloilo, Philippines
Capacity: 1.9MWp
Completion Year: 2016
Type: Metal roof Mounted
![Cebu, Philippines](/uploads/image/20190313/20190313083147324732.jpg)
Project Location: Cebu, Philippines
Capacity: 2.5MWp
Completion Year: 2017
Type: Metal roof Mounted
![Singapore](/uploads/image/20190313/20190313083153765376.jpg)
Project Location: Singapore
Capacity: 1.6MWp
Completion Year: 2017
Type: Metal roof Mounted
![Shiga-ken, Japan](/uploads/image/20190313/20190313083047904790.jpg)
Project Location: Shiga-ken, Japan
Capacity: 2MWp
Completion Year: 2015
Type: Ground Mounted
![USA](/uploads/image/20190313/2019031308300289289.jpg)
Project Location: USA
Capacity: 2.5MWp
Completion Year: 2015
Type: Ground Mounted
![Shanghai, China](/uploads/image/20190313/20190313083042114211.jpg)
Project Location: Shanghai, China
Capacity: 4.3MWp
Completion Year: 2018
Type: SR-FR-03
![Shanghai China](/uploads/image/20190313/20190313083036733673.jpg)
Project Location: Shanghai China
Capacity: 5MWp
Completion Year: 2016
Type: SR-SR-02
![Weihai, China](/uploads/image/20190313/20190313082980488048.jpg)